Road works at Kendray Hospital

Date:

Work will start at Kendray Hospital on Saturday 22 March, from 8:00am. Repairs will be made to the speed humps along the main drive as you enter the site, and a manhole will also be repaired on the left side just before the Burston Suite.

Incoming traffic will still be able to go up in front of the Oaks building for staff working around the main reception block, catering, and the Oaks, as the barrier will remain open whilst works are being carried out.

The car park at the Lodge will remain open as usual.

Road works at Kendray Hospital

time to read: <1 min